CNC Marking and Punching Machine for Plates Model YBJ80

The YBJ80 CNC Hydraulic Connecting Plate Punching Machine is often used in the production of Iron/Steel Towers in the Power transmission and transformation industry and the production of metal structural parts in the construction and bridge industries. It is mainly used for punching, drilling and typing of connecting plates.


  Contact Now
Product Details

1. Brief Introduction:

The YBJ80 CNC Hydraulic Connecting Plate Punching Machine is often used in the production of Iron/Steel Towers in the Power transmission and transformation industry and the production of metal structural parts in the construction and bridge industries. It is mainly used for punching, drilling and typing of connecting plates.

bf7a1b0fbe62186e50b8583f2c1d454.jpg

2. Machine Model and Configuration:

2.1 Mechanical Part

No.ItemYBJ80
1Machine Layout Area5*3.5 M
2No. of Hosts1 Set
3No. of Workbench Bases1 Set
4No. of Y-Slide1 Set
5No. of X-direction Slide 1 Set
6No. of Clamps2 Sets
8Pneumatic control system1 Set
9Hydraulic control system1 Set
10Buyer Preparation WorkingInstallation Site-cement foundation, embedded slabs and anchor bolts required by equipment, make the foundation according to the foundation plan provided by the supplier

2.2 Electric control Part

1CNC Controller systemPLC control system
2Drive SystemPanasonic Servo Motor

3. The main technical parameters of the machine

No.ItemYBJ80
1Processing plate size800*500mm
2Processing plate thickness5-20mm
3Punching force800KN
4Maximum punching diameterΦ26mm
5Total number of modules3 Pcs
6Number of punching die2 Pcs
7Number of print header groups1 Group
8Prefix10 Pcs
9Header size(L*W*H)14*10*19mm
10Number of CNC axes2
11X, Y axis servo motor power2*2KW
12X, Y axis feeding speed20m/min
13Punching speed50-55 Times/Min
14Total weight of equipment6T

4. Machine working environment

1Power supply3 Phase 4-Wire System
2Voltage3 Phase 415V±10%
3Frequency50Hz
4Operating Temperature0℃-40℃
5Relative Humidity<90% no condensation
6Compressed AirPressure: 0.8MPa Flow rate: 0.1m³/min

5. Machine parts introduction

The equipment is mainly composed of Punching Host Unit, Workbench Moving Unit, Clamp Assembly, Pneumatic System, Electrical System, Hydraulic System, etc.

6. List of main accessories

1. Machine layout diagram/drawing

2. Machine Tools List.

No.Commodity&SpecificationQtyMark/Note
1Punch rod (including nut)1 SetAccessories
2Prefix (number, English)1 Set/EachIncluding installed on the machine
3Upper jaw, lower jaw2 Pcs/EachAccessories
4Punch (φ17.5, φ21.5, φ25.5)1 Pcs/EachIncluding installed on the machine
5Die (φ19.5, φ23.5, φ24.7, φ27.5, φ28.7, φ29.5)1 Pcs/EachIncluding installed on the machine
6Quick change drill chuck1 SetIncluding installed on the machine (only available for YBJZ100 model)
7Typing pad1 PcsAccessories
8Open-end wrench1 PcsOpening 41mm
9Hexagonal Wrench1 set
10"+" screwdriver1 Pcs
11"-" screwdriver1 Pcs
12Proximity switch2 Pcs
13Air torch1 Pcs
14Mechanical manual1 Set
15Electrical manual1 Set
16Packing List2 SetAttached to the manual
17Certificate2 Pcs

Free sample testing:

For free sample making/testing, please send your samples or products CAD drawings, we can test run the machine and show you machine test running.

Progressing Solution Design

According to customer's product processing requirement, we can design the unique solution that supports higher manufacturing efficiency and better processing quality for customer.

7. Plat Drilling Machine Main Parameters

After-sales service:

Training for installation and service:

1) We will supply the machine with training video and user's manual in English for installing, operation, maintenance and trouble-shooting, and shall give technical guide by e-mail, whatsapp, Wechat, telephone/MSN/ICQ and so on, when you meet some problems of installation, using or adjusting.

2) You can come to our factory for inspection and training. We will provide professional guide. Direct and effective face-to-face training. Here we have assembled equipment, all sorts of tools and testing facility,we will also provide accommodation during training period.

3) The Strong after--sale service team in China, Our engineers (staffs) can speak fluent English to communicate and solve question when you have requirement calendar day per person.

4) Depending on the region, If need our engineer to visit for installation, we will dispatch engineer for installation and service at your site.

Installation and Training Time: 3-5 working days(Recommend).

Warranty:

The guarantee period of quality shall be 12 months counting from the date on which the machine finished installation and accept by Buyer. We are responsible for providing the free of charge during the guarantee period. If out of guarantee time, all damaged parts are charged.


Welcome to send your message to us
*Email
!!
*Content
!
Product Name
Your Name
Company
Tel/Fax.
Msn/Skype